The Greek NECP plan provides for two new gas plants (877 MW and 840 MW, respectively) -now under construction- to be added to the current fleet (6,037 GW), bringing the total installed capacity in 2030 to 7,885 GW. The authors argue that these may not be necessary. This 13-page analysis describes the discrepancy between Greece’s draft plans to boost gas […]