The German transmission system operators present two scenarios with different development paths in the Scenario Framework for the Gas NDP 2020-2030. Source: FNB Gas
This report is for subscribers only
Start with a FREE 30-day trial and then save up to 22% with an annual subscription. Get instant access to over 2,000 reports. Cancel anytime.
FREE TRIAL
Already a subscriber ? Log in
FREE TRIAL
Already a subscriber ? Log in













